Project Listings: Electrical Engineering

Drops 4, 5 and 6 Hydro Electric Project Powerhouse and Intake

Project Description:
Work involved the construction of a 7.0 mw hydro electric power plant on the SMRID Main Canal. The power plant is connected to the Provincial Power Grid and can be remotely monitored through the IRRICAN/SMRID SCADA system. The work also include the installation of two 7.0 m wide drop leaf gates on Drop 4 and the associated structural modifications. Also included was the design and installation of a flow measurement weir on an RID Lateral.

Location: SMRID Main Canal, Raymond, Alberta

Construction Value: $1,600,000

MPE's Role: Prime Consultant

St. Michael's Health Centre 200 Bed Designated Assisted Living Facility - Electrical

Project Description:
This designated assisted living facility accomodates 200 beds. 56 Beds of the 200 were designed for patients with dementia. The project included an Archtitectural, Structural, Mechanical and Electrical Design and Review Team. The major electrical components in the facility included the following:

  • Facility Lighting
  • Power Distribution
  • Fire Alarm System
  • Security and Door lock functions
  • Telephone and Nurse Call paging functions (All call paging over fire alarm speakers)
  • Data and Telephone Communication

Location: Lethbridge, Alberta

Construction Value: $23,000,000 (total project)

MPE's Role: Sub-Consultant